I thought I would try to send you a update on the progress being made on the bathroom. We finally got the tile laid on the floor, it looks a bit dusty in the photo as we had just finished installing the cabinets. We decided to put tile under the sink, it still needs to be grouted. The plumbing to the sink and faucet is not attached. We installed the mirror and lighting finally. The trim on the wall between the two paints needs put on...mostly little bits and pieces need finished....trim around the door needs painted and attached. The BIG job left to do is the shower tile .....it will match the floor and the sink tile. Here are a few pictures........
the SHOWER |
the sink |
mirror and lights.......had to turn them off to take photo |
tile floor |
linen cabinet |
another view of the sink |